How to use this template?
- Copy/paste into an email or RFQ form.
- Fill the blanks. If you don’t know an item, write “unknown—supplier to propose.”
- This template is written to produce comparable quotes across suppliers.
If you’re requesting a full line, use the line template instead: herbal extraction line quotation checklist
1) Project Overview (URS summary)
- Application: Botanical / herbal solid–liquid extraction
- Solvent system: ☐ Water ☐ Ethanol–water ☐ Other: ______
- Final product form: ☐ Liquid extract ☐ Concentrate/paste ☐ Other: ______
- Target compounds (optional): ______
- Avoid list (color/impurities): ☐ Chlorophyll ☐ Waxes ☐ Gums ☐ Other: ______
- Throughput target: ______ kg/day (dry basis preferred)
- Operating hours/day: ______
- Batches/day: ______
- Expected batch time: ______ hours (including heat-up, extraction, transfer)
2) Raw Material Inputs (critical for sizing & agitator)
- Material name/type: ______
- Form: ☐ Cut ☐ Powder ☐ Granules ☐ Slurry/Paste
- Moisture: ______ % (or unknown)
- Particle size window: ______ (e.g., 2–8 mm, or mesh range)
- Bulk density (if known): ______ kg/m³
- Swelling/gelling tendency: ☐ Low ☐ Medium ☐ High ☐ Unknown
- Foaming tendency: ☐ Low ☐ Medium ☐ High ☐ Unknown
- Viscosity behavior: ☐ Low & stable ☐ Rises during extraction ☐ Very high (paste) ☐ Unknown
3) Process Basis (ratios & operating conditions)
3.1 Solvent ratio and solids loading
- Ethanol–water ratio (if used): ______ % ethanol / ______ % water
- Solid–liquid ratio (S/L): ______ L/kg (dry basis preferred)
- Solids per batch: ______ kg
- Solvent volume per batch: ______ L
- Number of extraction stages: ☐ 1 ☐ 2 ☐ Other: ______
If you’re still deciding these ratios: ethanol–water ratio selection
3.2 Temperature and time
- Extraction temperature setpoint: ______ °C
- Max allowable temperature: ______ °C
- Extraction hold time: ______ hours (or endpoint criteria: ______)
- Do you operate near boiling / need reflux? ☐ Yes ☐ No ☐ Unknown
4) Tank Sizing Basis (working volume + headspace)
- Working volume (liquid/slurry): ______ L
- Headspace target: ______ % (recommend more if reflux/foam)
- Nominal tank volume class: ______ L (supplier to propose if unknown)
If you want the sizing logic: extraction tank sizing (working volume + headspace)
5) Heating/Cooling Requirements
1. Heating method preference: ☐ Steam ☐ Hot water ☐ Thermal oil ☐ Electric ☐ Supplier to propose
2.Utilities available:
- Steam: ______ bar(g) / ______ °C (if available)
- Hot water: ______ °C supply / ______ L/min (if available)
- Chilled water: ______ °C supply / ______ L/min (if available)
3.Heat-up time target: reach ______ °C in ______ minutes
4.Temperature stability requirement: ± ______ °C
5.Cooling requirement: ☐ Cool-down target ______ °C in ______ minutes ☐ No strict requirement
If ethanol heated near boiling: require vapor control and condenser interface (supplier to propose).
6) Agitation Requirements (define mixing duty, not only RPM)
- Mixing objective:
☐ Off-bottom suspension ☐ Complete suspension ☐ Wetting only ☐ Gentle mixing ☐ Other: ______ - Max viscosity (estimate): ______ cP (or unknown)
- Solids loading: ______ % w/w (or g/L)
- Speed range preference: ______ RPM (or supplier to propose)
- Shear sensitivity / fines concern: ☐ Yes ☐ No ☐ Unknown
Supplier shall provide:
- impeller type(s), diameter, stages
- motor power (kW) and gearbox ratio
- shaft torque requirement (N·m) at operating RPM
- seal type (single/double) and materials
7) Nozzles, Manways, Ports (operator reality)
- Solids charging method: ☐ Manual bags ☐ Hopper ☐ Screw feed ☐ Other: ______
- Manway requirement: ☐ Top ☐ Side ☐ Both ☐ Unknown
Sight glass requirement: ☐ Yes (location: ______) ☐ No - Sampling port requirement: ☐ Yes (slurry/clear) ☐ No
- Bottom drain: viscous discharge? ☐ Yes ☐ No ☐ Unknown
- If yes, supplier to propose valve type and discharge aids.
If you want practical port layout logic: ports and sampling selection
8) Materials, Finish, and Certificates
- Material of construction (wetted parts): ☐ SS304 ☐ SS316L ☐ Other: ______
- Surface finish requirement: ☐ Standard industrial ☐ Ra ______ μm ☐ Unknown
- Gasket material preference: ☐ PTFE ☐ EPDM ☐ FKM ☐ Unknown
9) Safety Scope (ethanol projects must define this)
- Solvent flammability: ☐ Ethanol or flammable solvent present ☐ Water-only
- Installation: ☐ Indoor ☐ Outdoor
- Hazardous area classification: ☐ Known (_____) ☐ Unknown (supplier to propose options)
- Explosion-proof scope required: ☐ Yes ☐ No ☐ Unknown
Minimum safety requirements:
- grounding/bonding for solvent transfer points
- over-temperature protection
- level protection (avoid dry boil/overfill)
- if reflux/heated solvent: cooling flow interlock
If you need scope guidance: EX scope for ethanol extraction
10) CIP and Cleanability (if required)
Cleaning method: ☐ Manual ☐ CIP-ready ☐ Full CIP
If CIP-ready:
- drainability and dead-leg control required
- spray device to be proposed with flow/pressure requirements
- CIP supply/return connections to be defined
11) Documentation, Drawings, and Testing
Documents required:
- Datasheet + GA drawing
- Nozzle list
- PFD / P&ID (if required)
- Electrical drawings
- O&M manual + spare parts list
- Interlock list (if PLC scope included)
Testing:
- leak/pressure test report
- agitation run test (no-load)
- temperature control test (if heating/cooling included)
- FAT (if required): acceptance criteria ______
12) Commercial Terms (optional)
- Delivery term: ______ (EXW/FOB/CIF/DDP etc.)
- Lead time expectation: ______ weeks (or request supplier to propose)
- Warranty expectation: ______
- Spare parts kit: ☐ Yes ☐ No ☐ Optional quote
FAQ (with answers)
1. What’s the minimum info needed for an accurate extraction tank quote?
Working volume, solvent system, solids per batch, temperature range, mixing objective, and whether reflux/flammable solvent safety scope applies.
2. Why do you ask for torque instead of only motor power?
Because low-speed mixing of viscous slurries is torque-limited. A “big kW” motor can still stall without the right gearbox torque.
3. If I don’t know my ethanol-water ratio yet, can suppliers still quote?
Yes, but the quote may be a range. Provide allowed ratios or constraints so suppliers can propose a safe, practical design.
4. Do I need CIP-ready design?
If you run multiple products, sticky extracts, or need quick changeovers, CIP-ready drainability and dead-leg control save downtime.
5. What causes most quote revisions and delays?
Missing safety scope (EX), unclear heating utility conditions, and insufficient mixing/solids data.