Most UAE inquiries are too vague: “We need an ultrasonic extractor.”
But a quote is only accurate when the supplier can define:
process mode (batch vs recirculation vs continuous)
energy input target (kJ/L, delivered power)
temperature control (cooling duty and stability)
solids handling (settling, fines, viscosity)
downstream bottlenecks (filtration, concentration, solvent recovery)
automation and safety scope
This page gives a copy/paste RFQ checklist that gets you an engineering-ready proposal fast.
If you want the full technical foundation first: Ultrasonic Extraction (UAE): Principles, Parameters & Scale-up
Copy/Paste UAE RFQ Checklist (Send to Suppliers)
A) Material & product requirements (must-have)
Material type and description
botanical/biomass name
form: cut / powder / slurry / paste
moisture content (% if known)
Target compounds / product goal
what you want to extract (e.g., phenolics, flavonoids, caffeine, curcumin, polysaccharides, pigments)
what you want to avoid (chlorophyll, waxes, bitterness, gums)
Final product form
liquid extract / thick concentrate / powder
key quality specs: color, odor, assay target, impurity limits
B) Solvent system & selectivity constraints (must-have)
Solvent system
water only, ethanol-water ratio, or other solvent (if allowed)
solvent restrictions (food grade / regulatory limits / site policy)
Selectivity preference
maximize yield (exhaustive) OR prioritize “clean extract” (less pigment/wax)
any known issues: too green, too bitter, too viscous, poor filtration
If your biggest issue is selectivity, this page is often the missing piece:
ethanol-water ratio for herbal extraction
C) Throughput and operating mode (must-have)
Throughput target
kg/day (dry basis if possible) or L/h extract flow
operating hours/day and batches/day
Preferred operating mode
batch (tank)
recirculation loop
continuous / flow-through
Batch size (if batch/loop)
solids per batch (kg)
solvent volume per batch (L)
D) UAE performance targets (highly recommended)
Your current benchmark method
maceration / tank extraction / Soxhlet / other
current time and yield (or assay) so supplier can quantify improvement
Target reduction in time / target yield
e.g., “reduce from 8 hours to 2 hours,” or “increase yield by 15%”
Temperature ceiling
max allowable temperature (°C) and why (thermolabile compounds, aroma loss)
E) Ultrasound parameters & power definition (critical for accurate design)
This is where most UAE RFQs fail.
Frequency preference (if any)
if unknown, supplier proposes based on application
Power information (choose what you have)
nameplate generator power (W)
amplitude setting used in lab (%), if applicable
any delivered power measurement results (calorimetry)
Energy density target (kJ/L) — if you have lab data
If you don’t have it, ask supplier to propose and validate.Duty cycle / pulse mode requirement (yes/no)
If overheating is a concern, pulse mode is often required.
F) Solids handling and mixing (must-have for slurries)
Solids loading
g/L or % w/w
Particle size window
sieve cut or milling method
whether fines are a known issue
Viscosity behavior
does it become sticky/resinous?
does viscosity rise during extraction?
Settling tendency
does the solid settle quickly?
do you need continuous suspension?
If filtration is your bottleneck, include:
current filtration method and micron rating
observed failure mode
Related reading: filter clogging after UAE: causes & fixes
G) Temperature control and cooling utilities (must-have)
Cooling utility available
tap water / chilled water / recirculating chiller
inlet temperature range and flow capacity (if known)
Temperature stability requirement
acceptable variation (±°C)
whether you need temperature logging
Heat exchanger preference (if loop/continuous)
yes/no, or supplier to propose
H) Downstream integration (must-have for realistic throughput)
UAE may speed extraction, but the plant is limited by downstream capacity.
Solid-liquid separation plan
bag filter / press / centrifuge
target filtration rate (L/h) and final micron
Concentration plan (if making thick extract/powder)
vacuum concentration required?
Related reading: vacuum concentration for herbal extracts
Solvent recovery expectations (if ethanol used)
reuse requirement, recovery rate expectation
Related reading: solvent recovery system for ethanol extraction
I) Automation, documentation, and safety scope
Automation level
manual / semi-auto / full PLC recipes
data logging required? alarms?
Safety scope
flammable solvent? indoor installation? ventilation conditions?
explosion-proof requirement (yes/no/unknown)
Documents required
GA drawing, PFD/P&ID, electrical drawings, manuals, FAT/SAT
“Minimum UAE RFQ” (short email template)
Copy/paste this if you need a short version:
Material: ____ (form, moisture, particle size, solids %)
Target compounds / avoid: ____ / ____
Solvent system: ____ (ethanol-water ratio)
Throughput: ____ kg/day, ____ h/day; batch size ____ kg + ____ L solvent
Operating mode: batch / recirculation / continuous
Temperature ceiling: ____ °C
Current benchmark: ____ (time/yield) → desired improvement: ____
Downstream: filtration ____ micron, concentration yes/no, solvent recovery yes/no
Safety/automation: ____ (indoor, explosion-proof scope, PLC/data logging)
FAQ (with answers)
1. Why do you ask for kJ/L or delivered power?
Because nameplate watts and amplitude % are not transferable. kJ/L is the best metric to translate lab performance to pilot/industrial design.
2. What if I don’t know kJ/L yet?
Provide your lab settings and temperature curve. Ask the supplier to characterize delivered power (calorimetry) and propose energy density targets.
3. Why do you ask about cooling utilities?
UAE generates heat. Without knowing cooling capacity, suppliers cannot guarantee temperature ceiling or repeatability.
4. Why do you ask about filtration and viscosity?
Because UAE frequently shifts the fines/colloid profile and filtration becomes the real throughput bottleneck.
5. What is the most common missing item?
Batch rhythm (batches/day), solids loading, cooling details, and downstream capacity (filtration + recovery).
Submit your UAE RFQ (we’ll respond with a structured proposal)
Paste the checklist answers and we’ll propose: operating mode, energy density targets, cooling strategy, and downstream integration.